Improvement of the energy situation at St Josephs Hospital Kitgum

Technical Information
Size of Solar System 104 x REC solar panel 295 Wp
Total 30.7kWp
Inverter Type 2 x Riello SIRIO EVO 12500 solar inverter 12.5kW

 

Project Information
Project Partner St. Joseph’s Hospital Kitgum
Financed by DKA Dreikönigsaktion
Project Duration 04.2019 – 12.2019
Project Location Kitgum, Uganda
Short Project Description The solar system is for the electricity supply of the hospital to improve the health services provided.

The PV System in combination with the existing UPS avoids electricity black outs; Furthermore the system decreases the running costs of both, grid power and diesel generator.

 

Solar system at the St. Marys Hospital, Isingiro

Technical Information
Size of Solar System 30 x AXIpower 275Wp
Total 8.25kWp
Inverter Type 1 x SMA Sunny Tripower 10000-TL-20 10 kW
Battery Type 2 x BYD Li-Ion Battery B-Box 13.8kWh 48V

 

Project Information
Project Partner St. Marys Hospital Isingiro
Financed by Bruder und Schwester in Not Innsbruck
Project Duration 01.2019 – 09.2019
Project Location Isingiro, Uganda
Short Project Description The solar system is for the electricity supply of the hospital to improve the health services provided.  Before the system was installed, the institution was relying on the power from the grid, where power cuts of up to 6 hours a day were not uncommon. With the new system (combination of Solar PV, Battery Backup and Generator Back up) the hospital can operate independently from the unreliable national grid, which improves the health services provided tremendously.

PV System Lacor Hospital

Technical Information
Size of Solar System 180 x Axitec solar panel 305Wp
Total 54.9kWp
Inverter Type 2 x SMA Sunny Tripower STP 25000-TL-30
w/ display

 

Project Information
Project Partner St. Mary’s Hospital Lacor, Gulu
Financed by St. Mary’s Hospital
Project Duration 09.2019 – 07.2020
Project Location Gulu, Uganda
Short Project Description The solar system is for the electricity supply of the hospital to improve the health services provided and reduce running costs.
More information about the hospital see here: http://www.lacorhospital.org/

 

Electricity supply for the Bunagok Parish, Diocese of Rumbek

Technical Information
Size of Solar System 12 x AXIworldpremium 300Wp
Total 3,6kWp
Inverter Type & Monitoring system Victron EasySolar II 48/3000/35-32 MPPT 250/70 GX
Battery Type 1 x BYD LiIon Battery B-Box 13.8kWh 48V

 

Project Information
Project Partner Diocese of Rumbek
Financed by Diocese of Rumbek
Project Duration 09.2019 – 04.2020
Project Location Rumbek, South Sudan
Short Project Description The solar system is for the electricity supply of the Bunagok Parish. It is the only electricity supply provided in the village. It is a small island system, because no public grid is available. Additionally a small generator was delivered as a power backup for the rainy season.

 

PV System Bishop Taban, Juba

 

Technical Information
Size of Solar System 12 x Axitec solar panel 325 Wp mono 120 half-cells
Total 3,9kWp
Inverter Type 1 x MultiPlus 48/3000/35-50 230V VE.Bus
Battery Type 1 x BYD Battery Box Premium LVL 15.4 48V Lithium
Monitoring system Victron Cerbo GX monitoring system

 

Project Information
Project Partner Diocese of Juba
Financed by Pro Sudan Austria
Project Duration 09.2019 – 04.2020
Project Location Juba, South Sudan
Short Project Description The solar system is for the Bishop’s residence and Diocesan guest house.

 

Solar System at Centre Professional Don Bosco

 

Technical Information
Size of Solar System 60 x Axitec solar panel 280 Wp AC-280PH/60S
Total 16.8kWp
Inverter Type 3 x SMA Sunny Boy SB 5.0
Battery Type 3 x BYD LiIon Battery B-Box 13.8kWh 48V
Monitoring system SMA data manager M edmm-10

 

Project Information
Project Partner Centre Professional Don Bosco
Financed by Centre Professional Don Bosco
Project Duration 10.2019 – 11.2020
Project Location Kinshasa, Democratic Republic of Kongo
Short Project Description The solar system is for the electricity supply of the school and boarding school to improve the educational services provided and the security situation at night.
The school is located in an outside district of Kinshasa with poor grid connection.

 