The construction of drinking water and extinguishing water pipes is divided into three points.
Survey of the actual state
- Creation of the maps of the location
- Determining of the day, month and year curves
- Determining of potenitial leaks of the consisting water pipes
- Water quality check of the drinking water and the cleaned wastewater
- Documentation of the water networks
Planning of new drinking water and extinguishing water pipes
- Elevation of the water demand in the next 20 years
- Planning of the new water pipes
- Detail planning of the connections and shafts
- Creation of detail drawings
Technical implementation
Projects on drinking water:
Water supply for St. Mary’s in Tansania