New photovoltaic system in St. Josephs Hospital

In spring 2017 BBM received the order to support the St. Josephs Hospital in Kitgum (UGANDA) with the installation of a photovoltaic system.

The unsteady electrical power supply and breakdowns handicapped the hospital work enormously.

On November 28th 2017 the PV system was successfully tested and handed over to the hospital. Already on the following day, a Sunday, from 09:00 a.m. on, the hospital was fed entirely by the PV system. On weekdays the feed-in of the PV will be between 25 and 30 %. A first and important step for a smooth, efficient and economic electrical power supply fort the hospital.

This project was financed by a co-financing of EWK Zell (http://www.ewk-zell.at/)  and the Epiphany mission of the catholic youth (http://www.dka.at/).

 

Technical data:

PV installed: 25.000 Wp

2 inverter modules Aros each 12,5 kW

UPS for solar operation Aros 120 kW bidirectional

Batteries 33x 12V 150Ah C10 of Hoppecke

 

Procurement and logistics by BBM Beschaffungsbetrieb der MIVA

Installation: BBM  and MECS / Gulu

Time of installation: 16 days including earthwork and tests